Structural calculations and building regulations: what drawings you actually need
We explain which drawings and structural calculations you may need for a London extension, loft conversion or internal alteration.
Planning drawings, building regulations drawings and structural calculations do different jobs. If you are planning a loft conversion, extension or wall removal in London, understanding those differences helps you avoid gaps between gaining permission and getting the work built safely.
At Simplicity Designs UK Limited, we coordinate architectural design and structural engineering. Here is how we approach the information you actually need.
Planning drawings are not construction drawings
Planning drawings usually show what a proposal looks like and how it relates to the property and its surroundings. A typical planning application includes a location plan, existing and proposed floor plans, elevations and relevant sections.
These drawings explain matters such as layout, size, appearance and overlooking. They will not necessarily specify beam sizes, foundation details, insulation build-ups or fire protection.
Planning permission does not confirm compliance with the Building Regulations. Equally, work that does not need planning permission may still need building regulations approval. Removing a load-bearing wall is a common example.
What building regulations drawings should show
Building regulations drawings develop the design into technical information that can be assessed by building control and used alongside structural details during construction.
Depending on the project, we would expect the package to cover:
- Dimensioned plans and sections showing the proposed construction.
- Wall, roof and floor build-ups, including insulation and moisture protection.
- Fire safety measures, escape arrangements and relevant door specifications.
- Drainage layouts, ventilation and other applicable services information.
- Stair dimensions, guarding and headroom where relevant.
- Structural locations and references coordinated with the engineer’s design.
The Building Regulations 2010 set the legal requirements in England. The government’s Approved Documents provide guidance on meeting them, including Approved Document A for structure, B for fire safety and L for energy efficiency. The relevant requirements depend on the work, not simply the project’s description.
When structural calculations are needed
Need advice on your own project? Call 0203 026 2883 or request a fee quote.
Structural calculations demonstrate that the proposed structure can safely carry the loads placed on it. They commonly support designs for steel beams, new floor joists, roof alterations, openings in load-bearing walls and foundations.
For a wall removal, an engineer needs to consider more than the beam spanning the opening. The design may also need to address bearing lengths, padstones, supporting walls or posts, foundations and overall stability.
For a loft conversion, calculations may cover new floor construction, roof supports and connections. For an extension, ground conditions, nearby trees, drains and existing foundations can influence the foundation design.
Not every alteration needs a substantial calculation package. We establish what is necessary from the proposed work and available information, with investigation or opening-up where needed.
Calculations need matching structural drawings
A calculation report alone is rarely a complete set of building instructions. Structural drawings or clearly coordinated details should identify member sizes, positions, supports, connections and relevant specifications.
Before construction, we check that the architectural and structural information agrees. A beam position can affect ceiling heights, stairs, drainage routes and the appearance of a room. Resolving those clashes on paper is preferable to making rushed decisions on site.
We also clarify the scope of the package. Fabrication drawings, temporary works design and construction sequencing may need separate input; they should not be assumed to be included.
What to arrange before work starts
Ask your designer which drawings are included, who is providing the structural design and which building control application route suits the work. The Planning Portal explains the main building control routes, but eligibility and suitability vary.
Agree inspection arrangements with building control before starting. Approval of drawings does not replace site inspections, and completion documentation depends on the completed work and supporting evidence.
For London terraces and flats, we also check whether party wall procedures, leaseholder permissions or listed building consent need separate attention. Building regulations approval does not replace these.
If you need structural calculations or building regulations drawings in London, call our team on 0203 026 2883 or send your details to info@simplicity-designs.co.uk. We can help identify the right information for your project.
Work with Simplicity Designs
Planning a project affected by this?
Request a fee quote
Tell us about the property and what you want to build. We reply with a clear architectural fee.
Get my quote →02Book a consultation
A call with an experienced planning designer to test what's achievable on your site.
Book a consultation →03Call us directly
Speak to the practice directly about your project.
0203 026 2883More reading: planning guides and official sources · planning permission in London · all articles
Begin a conversation
Have a property in mind?
Tell us a little about your project and we will come back to you within one working day. Prefer to talk? Call us, or email anytime.
info@simplicity-designs.co.uk ↗